Fadjar, A., Ali, A. A., & Setiawan, A. (2023). ESTIMATING HOUSE CONSTRUCTION COMPLETION TIME WITH PROBABILISTIC ACTIVITIES DURATION USING THE PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) METHOD. Jurnal Sains Dan Teknologi Tadulako, 9(1), 1–9. https://doi.org/10.22487/jstt.v9i1.449